ClassifiedsDirectoryAboutContactAdvertise
TrialSubscribeSign In
Photo Courtesy Lindsay Reidt Short Elliott Hendrickson
In 2021 the 5,750 by 100-foot runway at Grand Rapids was resurfaced by removing the old pavement and replacing it in kind. At the same time, extensive drainage improvements were implemented, including the installation of a full sub-surface system.